ENERGY ENGINEERS INC.
PROJECTS
West Deptford Energy Station Black Start Facility
Installation of three Caterpillar 4 MW diesel engine generators
to provide black start power to the existing two-on-one Combined Cycle Power Plant. The black start facility provides
starting capability to the plant when backfeed power from the transmission system is not available.
  EEI was a member of the CONTI EPC team.
Copyright 2017 Energy Engineers Inc All Rights Reserved (V5.1)